Nismo Replica Bumper - Polyurethane - GB
#43
...
Hi guys,
Sorry for the delayed response. The reason I have not been responding is because I have nothing solid - this deal might fall through.
Due to the increasing price of PU material, steel (the mold) and the steadily weakening US dollar, the factory has quoted a significant price increase in the bumper.
We are still negotiating with them at this point, but I don't know how much light there is at the end of this tunnel.
I will keep everyone updated as soon as I hear word.
Thanks,
Gary
Gruppe-S
Sorry for the delayed response. The reason I have not been responding is because I have nothing solid - this deal might fall through.
Due to the increasing price of PU material, steel (the mold) and the steadily weakening US dollar, the factory has quoted a significant price increase in the bumper.
We are still negotiating with them at this point, but I don't know how much light there is at the end of this tunnel.
I will keep everyone updated as soon as I hear word.
Thanks,
Gary
Gruppe-S
#46
Registered User
iTrader: (6)
Join Date: Sep 2003
Location: Richmond, Virginia
Posts: 802
Likes: 0
Received 0 Likes
on
0 Posts
gruppes-s,
now, please kill the tread if this deal is not giong to happen.
and. when we get lucky, remake it.
i think its time to end this tread.
anyway thanks for working hard for us. that was most exciting groupe buy tread ever hope this really happens soon.
now, please kill the tread if this deal is not giong to happen.
and. when we get lucky, remake it.
i think its time to end this tread.
anyway thanks for working hard for us. that was most exciting groupe buy tread ever hope this really happens soon.
#52
Hi guys,
As an update, the prototype will be ready by the end of April. Production run of first 50pcs should be ready by mid-May.
We will begin taking deposits as soon as the prototype is tested and confirmed for excellent fitment (we will have pictures). The pricing may be adjusted due to weakening US dollar.
Thanks!
Gary
Gary@gruppe-s.com
Gruppe-S
As an update, the prototype will be ready by the end of April. Production run of first 50pcs should be ready by mid-May.
We will begin taking deposits as soon as the prototype is tested and confirmed for excellent fitment (we will have pictures). The pricing may be adjusted due to weakening US dollar.
Thanks!
Gary
Gary@gruppe-s.com
Gruppe-S