4.15L NA VQ Engine Build with Rebello and Zcargarge
I heard that if there is any oil on the surface of the block or the heads before assembly it will blow the head gasket. Maybe that's why it went. He put the head studs in with too much oil and it seeped out and blew the head gasket? Or it dripped off on the block.
Last edited by Andrei; Sep 7, 2011 at 08:20 PM.
Just think about what it is like when the engine is operating, if it has oil on it, generally it gets lubed, if it is something that stays dry, make sure it is clean, and yes, the head and block surfaces should be cleaned with alcohol before they go on. Mgrotel, if you have any questions, let me know, been there, done that, and I had some good help and a Nissan fsm to help, if you want it pm me for my phone number
Not related to the engine but just in case anyone is interested.
http://www.diymobileaudio.com/forum/...integrity.html
http://www.diymobileaudio.com/forum/...integrity.html
I believe he is staying as, personally, I will be running 11:1 with the votech, I am stupid excited to see where the build goes, I want to see what supercharger he ends up running, and I love seeing a custom made intercooler!!
Ha. I want to go SC, too. My friend has an old firebird w/ a built motor and SC. Not my platform of choice, but 800whp is 800whp. Incredible.
I'm thinking I'd be somewhere close to 500whp with a vortech and some fuel system upgrades.
Can't wait to see how this turns out!
I'm thinking I'd be somewhere close to 500whp with a vortech and some fuel system upgrades.
Can't wait to see how this turns out!
Sometimes I wish I had and LS engine too, haha. Those thing produce so much power so easily. I'm not shooting for too much power so hopefully the end result won't give me too much long term headaches.
ETA for my project is by the end of the year, that'd be a nice xmas present to myself. SC is mounted and most of the piping are pretty much laid out already. Other then that cams and water injection are the other remaining things to be done. So I'm keeping my fingers crossed.
ETA for my project is by the end of the year, that'd be a nice xmas present to myself. SC is mounted and most of the piping are pretty much laid out already. Other then that cams and water injection are the other remaining things to be done. So I'm keeping my fingers crossed.










