Minnesota Chat Thread
Yeah Aaron I know this I have 20mm spacers but they wont fit since the studs are built in and hit the wheels and wheels don't have the dropouts for the studs to fit in. Not sure what the offsets are I picked them up from Greg 235/35/19 in the front 275/30/19 in the rear. I need to get the spacers with seperate studs I am thinking maybe 15 mm maybe even 20 theres quite a bit of gap.
Last edited by bonarsauce; May 5, 2011 at 12:54 PM.
V2 bumper looks great Par, even with the canards
....I can see how it would look really nice with out them as well. Might be worth filling the holes and having it sprayed if the color is a little off anyways.
Too bad about the spacers
that was one nice thing about the stockers, they have the hollow spot for the bolt on spacers.
I put on the H&R DRS spacers with the new studs for the Z34. I could have got the DRM ones for the rears but not the fronts....so I just got the DRSs all around. They weren't too bad to install...definitely need an impact to seat the new studs in.
....I can see how it would look really nice with out them as well. Might be worth filling the holes and having it sprayed if the color is a little off anyways.Too bad about the spacers
that was one nice thing about the stockers, they have the hollow spot for the bolt on spacers. I put on the H&R DRS spacers with the new studs for the Z34. I could have got the DRM ones for the rears but not the fronts....so I just got the DRSs all around. They weren't too bad to install...definitely need an impact to seat the new studs in.
Joined: Aug 2004
Posts: 28,899
Likes: 1,906
From: Twin Cities, MN
As a mod on another site, may I remind you that discussing the C&C meet and cruise should be in the other thread. That is all. Carry on.

Beautiful wheels, Greg. I have dibs for when you tire of them.
Par, the Z looks good. I like it. Now get some spacers. lol
I have a route mapped out. See you in the other thread.

Beautiful wheels, Greg. I have dibs for when you tire of them.
Par, the Z looks good. I like it. Now get some spacers. lol
I have a route mapped out. See you in the other thread.
and I did get your message. All is good with my dad. He has been down to the farm a couple times and seems good.
As far as the meet goes... doubt I will be to the c&c part, but maybe meet up at the point later in the day. And for all you guys that are going on the cruise, keep in mind the construction over hastings bridge.
As far as the meet goes... doubt I will be to the c&c part, but maybe meet up at the point later in the day. And for all you guys that are going on the cruise, keep in mind the construction over hastings bridge.
and I did get your message. All is good with my dad. He has been down to the farm a couple times and seems good.
As far as the meet goes... doubt I will be to the c&c part, but maybe meet up at the point later in the day. And for all you guys that are going on the cruise, keep in mind the construction over hastings bridge.
As far as the meet goes... doubt I will be to the c&c part, but maybe meet up at the point later in the day. And for all you guys that are going on the cruise, keep in mind the construction over hastings bridge.
Aaron you 100% should plan to meet us at the point for lunch atleast man! ...its like a hop skip and a jump away!
I think the annual bridge inspection is over, so all lanes should be open.
From the MNDOT site:
Hwy 61 – new Hastings Bridge project (Mississippi River crossing)
Description: Construct new 100-year, free standing arch bridge to replace existing through-truss bridge.
Construction Dates: October 2010 – May 31, 2013.
Traffic Impacts: Low for most of the project. Two-way traffic (one lane of traffic in each direction) will be maintained except during the annual safety inspection of the existing bridge and during one weekend in 2011.
I did find this article about some construction downtown in Hastings too:
http://www.hastingsstargazette.com/e...icle/id/24802/
From the MNDOT site:
Hwy 61 – new Hastings Bridge project (Mississippi River crossing)
Description: Construct new 100-year, free standing arch bridge to replace existing through-truss bridge.
Construction Dates: October 2010 – May 31, 2013.
Traffic Impacts: Low for most of the project. Two-way traffic (one lane of traffic in each direction) will be maintained except during the annual safety inspection of the existing bridge and during one weekend in 2011.
I did find this article about some construction downtown in Hastings too:
http://www.hastingsstargazette.com/e...icle/id/24802/



