How long does it take?????????
#2
Registered User
Join Date: Aug 2002
Location: Dobbs Ferry, NY
Posts: 484
Likes: 0
Received 0 Likes
on
0 Posts
Ordered 2/12/02 from dealer (His #1 order)
Received VIN 7/18/02
Car Built 7/31/02
Car assigned to the Ocean Spirit 8/13/02
Delivered to Port Elizabeth, NJ 9/9/02 at 4:07 PM
Expected delivery date to my dealer 10/1/02
Actual delivery date 9/13/02 at 9:45 AM
Picked up the morning of 9/17/02
Hope this gives you a good idea of the wait..
Steve (k2we) Dobbs Ferry, NY
Touring/KY0/6MT/Side air bags & mats
Received VIN 7/18/02
Car Built 7/31/02
Car assigned to the Ocean Spirit 8/13/02
Delivered to Port Elizabeth, NJ 9/9/02 at 4:07 PM
Expected delivery date to my dealer 10/1/02
Actual delivery date 9/13/02 at 9:45 AM
Picked up the morning of 9/17/02
Hope this gives you a good idea of the wait..
Steve (k2we) Dobbs Ferry, NY
Touring/KY0/6MT/Side air bags & mats
#4
Originally posted by k2we
Received VIN 7/18/02
Car Built 7/31/02
Received VIN 7/18/02
Car Built 7/31/02
even more general, they like to say "october build, late november delivery"
check here https://my350z.com/forum/showthread....+long+delivery
Last edited by roberto350z; 09-24-2002 at 04:23 PM.
#5
Registered User
Join Date: Aug 2002
Location: Dobbs Ferry, NY
Posts: 484
Likes: 0
Received 0 Likes
on
0 Posts
From what I have been told by Nissan, the VIN number is issued BEFORE the car is built.. When the order is placed to put the car into assembly, the VIN is issued.. That's how they know what options go in which car.. My car came with a paper in it saying the build date was 07/31 That was 13 days after the VIN was issued.. I got to keep all the interesting paperwork the dealer normally keeps (or throws away)
Same thing happened when I ordered my Yukon. I had a VIN number 1 week before it was built. They faxed the VIN to the dealer with the order to confirm..
Steve (k2we) Dobbs Ferry, NY
Same thing happened when I ordered my Yukon. I had a VIN number 1 week before it was built. They faxed the VIN to the dealer with the order to confirm..
Steve (k2we) Dobbs Ferry, NY
#6
Registered User
Join Date: May 2002
Location: Indiana
Posts: 320
Likes: 0
Received 0 Likes
on
0 Posts
ZISME has been pretty insistent that the VINs are not put into the system until after your car is 2-3 days out of port. Did you get your VIN from someone deep inside of Nissan that got the information early?
I doubt the plants need your VIN to know what options to put on the car as it is built. They have your Order number (R, S, T, ...) that directs them to your shop/build order that contains all of the options.
I doubt the plants need your VIN to know what options to put on the car as it is built. They have your Order number (R, S, T, ...) that directs them to your shop/build order that contains all of the options.
#7
originally by ZISMEOnce a vehicle gets built and loaded on a ship and the ship departs for the U.S. a vin# will show up in our system. .. Please understand that vin info is not available until the ship sails
Thread
Thread Starter
Forum
Replies
Last Post
MAsSIVrOOM
Engine & Drivetrain
2
10-20-2023 10:50 AM
ars88
Zs & Gs For Sale
18
04-04-2016 07:52 AM