I am very interested in knowing how much time people are charged for their mod installs. I'm more curious about those who had it installed by a certified technician at a shop vice a DIY.

The mods are:

- Headers

- Flywheel

- Camshafts


Also, is there any times savings with a combination install, say headers and flywheel at the same time?

I'd like to hear particularly from vendors who install parts. Jeff @ performancenissan, it'd be cool to hear your input.

I'm certain this would be invaluable info for the budget minded 350Z consumer. Thanks.
Old 12-26-2003, 07:19 AM
  #2  
FLY BY Z
Registered User
 
FLY BY Z's Avatar
 
Join Date: Dec 2002
Location: Maryland
Posts: 2,700
Likes: 0
Received 0 Likes on 0 Posts
Default

5 - headers
5 - fly
12 - cams

although the flywheel SHOULD be 3.5
Old 12-26-2003, 09:38 AM
  #3  
Eagle1
Registered User
iTrader: (2)
 
Eagle1's Avatar
 
Join Date: Nov 2003
Location: Pasadena, Ca.
Posts: 1,037
Likes: 0
Received 2 Likes on 2 Posts
Default Flywheel-clutch installation

Rocky at Performance Nissan did my Nismo flywheel and Nismo clutch installation. The two together took him 3.5 hours, and that included a ten to fifteen minute stint under the car with me, showing me the parts side by side to show where they were different and what those differences were meant to achieve, and describing what the sound and performance differences would be and what to look for etc.
Very good experience there.
Old 12-26-2003, 02:39 PM
  #4  
swinke
Registered User
 
swinke's Avatar
 
Join Date: Nov 2003
Location: Las Vegas
Posts: 174
Likes: 0
Received 0 Likes on 0 Posts
Default ATI Procharger HO - E-Manage

ATI Procharger HO - 28hrs
E-Manage w/ all harnesses and gadget aval.-5hrs (laying on my side on cardboard boxes so I could reach the ECU. Still feels like someone hit me in the left ribcage with a 2x4)
Old 12-26-2003, 04:35 PM
  #5  
Eagle1
Registered User
iTrader: (2)
 
Eagle1's Avatar
 
Join Date: Nov 2003
Location: Pasadena, Ca.
Posts: 1,037
Likes: 0
Received 2 Likes on 2 Posts
Default Instal times

ATI Procharger. 24 hours. (No way is it 8 to 10 hours, unless you have done it a lot of times and set yourself up to do it a bunch more.)

Headers. 5 hours. (not much room to work with, gentlemen)
Old 12-26-2003, 05:06 PM
  #6  
350Z-RED
Registered User
 
350Z-RED's Avatar
 
Join Date: Jun 2003
Location: Boston
Posts: 169
Likes: 0
Received 0 Likes on 0 Posts
Default

took me 7 hours for the headers, borla says 4
Old 12-26-2003, 06:55 PM
  #7  
350ed
Professional
iTrader: (17)
 
350ed's Avatar
 
Join Date: Aug 2003
Location: San Diego
Posts: 1,045
Likes: 0
Received 0 Likes on 0 Posts
Default

Anything special about the header installs? Any unusual tools? What extra needs to come out to make room (besides air intake).
Thanks.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
MAsSIVrOOM
Engine & Drivetrain
2
10-20-2023 10:50 AM
wanderingstuden
Maintenance & Repair
6
01-28-2016 07:03 PM
kyin
New Owners
12
10-15-2015 05:54 AM
codek
Intake Exhaust
11
09-28-2015 03:03 AM
Extreme Dimensions
Southern California
0
09-24-2015 03:35 PM



Quick Reply: Install times -- please post



All times are GMT -8. The time now is 12:04 PM.