Ings+1 N-Spec body kit pieces...can they be bought seperately?
#7
Registered User
Join Date: Aug 2002
Location: Los Angeles
Posts: 808
Likes: 0
Received 0 Likes
on
0 Posts
It is the half spec, you can get everything seperately..However the wait time for that kit is A WHILE. I purchased one in late January and it just came about 2 weeks ago. Right now I heard the wait time is even longer-- about 4-6 months to your door because the kit is hot, and also because INGS has small production facilities.
Trending Topics
#11
Registered User
Thread Starter
Join Date: Jan 2003
Location: .
Posts: 1,199
Likes: 0
Received 0 Likes
on
0 Posts
Re: hehe just installed that kit
Originally posted by G*Rated{350z}
go to vividracing.com i think the have the best price for that kit.
go to vividracing.com i think the have the best price for that kit.
Mike at Vivid seemed like a nice guy. Quoted me a 4-5 week ship time. Apparently the price of this kit in Japan is going up; he says I got my order in right before the price increase (+200$).
G*rated..did you get the FRP or Hybrid Aero version?
#12
Registered User
Thread Starter
Join Date: Jan 2003
Location: .
Posts: 1,199
Likes: 0
Received 0 Likes
on
0 Posts
Originally posted by shaneotool
check out bulletproofautomotive.com
check out bulletproofautomotive.com
#13
Give Adam at Z-1 Performance a call. I know he has another container shippment leaving Japan in June. You should be able to get the body kit put on that. He is very honest and has been in the industry a long time. I have order lots of parts from him and trust him.
z1sales@z1auto.com
631-863-3820
thanks,
Greg
z1sales@z1auto.com
631-863-3820
thanks,
Greg
#14
We ship a container over once a month, its not a matter of shipping. Its a matter of the manufacturer not being able to provide the parts in a timely matter. The Z33 stuff is VERY hot in Japan right now, and most of the companies have very small production facilities and many vehicles to supply for. Contact ings+1 direct and ask them if they have these in stock. (they don't) They are backordered for 6-7 weeks now. And they don't produce them faster, or more often because we ask - we have to pay in full before they start to build any of these kits. Once paid, maybe they wait a few weeks and collect orders until they are running "z" stuff, to maximize production. Who knows. Bottom line is some of the parts take extended time to be manufactured -We ordered a Top Secret Carbon hood for an S2000 recently - 22 weeks! (and had to be prepaid) Ouch!
Then we can discuss alternative freight options. Airfreight is an option, but very expensive. Otherwise the parts are containerized monthly and shipped as they are ready. If the parts do not make it to our Japan warehouse by the cut off date, they cannot be containerized and shipped. In essence, the worst case scenario is something coming in the day after cut off and has to sit a whole month before making the NEXT container. This would build in 4-5 weeks for that item. It would be unrealistic to ship everything individually as it was ready, not to mention extremely expensive.
Our pricing and ordering structure takes into account the parts must be prepaid and pre ordered, and includes all inbound customs and duties, freight and logistics, as well as any other associated fees. If we were to try and keep items in stock, the prices would be much higher and the selection not as vast. Which would people prefer?
Then we can discuss alternative freight options. Airfreight is an option, but very expensive. Otherwise the parts are containerized monthly and shipped as they are ready. If the parts do not make it to our Japan warehouse by the cut off date, they cannot be containerized and shipped. In essence, the worst case scenario is something coming in the day after cut off and has to sit a whole month before making the NEXT container. This would build in 4-5 weeks for that item. It would be unrealistic to ship everything individually as it was ready, not to mention extremely expensive.
Our pricing and ordering structure takes into account the parts must be prepaid and pre ordered, and includes all inbound customs and duties, freight and logistics, as well as any other associated fees. If we were to try and keep items in stock, the prices would be much higher and the selection not as vast. Which would people prefer?
#15
Registered User
Thread Starter
Join Date: Jan 2003
Location: .
Posts: 1,199
Likes: 0
Received 0 Likes
on
0 Posts
thanks, but I already ordered from vivid racing. They said it will be here in 4 to 5 weeks.
Originally posted by turbo03
Give Adam at Z-1 Performance a call. I know he has another container shippment leaving Japan in June. You should be able to get the body kit put on that. He is very honest and has been in the industry a long time. I have order lots of parts from him and trust him.
z1sales@z1auto.com
631-863-3820
thanks,
Greg
Give Adam at Z-1 Performance a call. I know he has another container shippment leaving Japan in June. You should be able to get the body kit put on that. He is very honest and has been in the industry a long time. I have order lots of parts from him and trust him.
z1sales@z1auto.com
631-863-3820
thanks,
Greg
Thread
Thread Starter
Forum
Replies
Last Post
Extreme Dimensions
Southern California
0
09-24-2015 03:35 PM