Test Pipes installed!
Yay! It took me a lot longer than I planned- but I rented a stall at my auto hobby shop on base (6 dollars an hour for the lift
), took me a total of 3 hours
I have some bumps, I have some scrapes, my knuckles hurt from having to break bolts loose and punching my transmission... All in all, it was amazing!
Now, since I know nothing about brakes/rotors, that is why I am having someone help me, Wasuber! Plus I am buying crap off him (his air box, yes I still want it)- once I get the brakes/rotors done- that will have to be it till I get back from the desert. I'll save some money up while over there and get something nice for my Z, probably not enough to get a super charger... but maybe...
), took me a total of 3 hours
I have some bumps, I have some scrapes, my knuckles hurt from having to break bolts loose and punching my transmission... All in all, it was amazing!Now, since I know nothing about brakes/rotors, that is why I am having someone help me, Wasuber! Plus I am buying crap off him (his air box, yes I still want it)- once I get the brakes/rotors done- that will have to be it till I get back from the desert. I'll save some money up while over there and get something nice for my Z, probably not enough to get a super charger... but maybe...
Thread
Thread Starter
Forum
Replies
Last Post



