Only two days left - Vortech
Thread Starter
Sponsor
Avalon Racing
Avalon Racing
iTrader: (5)
Joined: Sep 2002
Posts: 652
Likes: 0
From: Londonderry, NH
Prices are going up on January 3rd
All order must be placed by December 15th - 5:00PM EST.
There is no exceptions per Vortech.
Vortech - 350Z / G35 satin kits - $4071.00 shipped
Vortech - 350Z / G35 polished - $4310.00 shipped
All order must be placed by December 15th - 5:00PM EST.
There is no exceptions per Vortech.
Vortech - 350Z / G35 satin kits - $4071.00 shipped
Vortech - 350Z / G35 polished - $4310.00 shipped
Last edited by Avalon Racing; Dec 13, 2004 at 03:08 PM.
Originally posted by Avalon Racing
yes - our normals price wioll be going up by about $300.00 + dollars. Dealer cost going up as much if not more.
regards
yes - our normals price wioll be going up by about $300.00 + dollars. Dealer cost going up as much if not more.
regards
is there a reason for them rasing the price did they add things to the kit???
Thread Starter
Sponsor
Avalon Racing
Avalon Racing
iTrader: (5)
Joined: Sep 2002
Posts: 652
Likes: 0
From: Londonderry, NH
Actually it is expected that all maufacuters will be raising prices. The cost of raw materials, like steel and other metals has risen dramatically. Our expected price for the new year on the Vortech kits will be around $600.00. This is still about $800.00 less than the average street price of the GReddy kit.
There have been improvements in the kits for the last 6 months like the BOV, etc.
Basicallyt expect metal based products to start to rise.
There have been improvements in the kits for the last 6 months like the BOV, etc.
Basicallyt expect metal based products to start to rise.
Thread
Thread Starter
Forum
Replies
Last Post
Lt_Ballzacki
Brakes & Suspension
39
Aug 6, 2021 06:19 AM
CFAUVEL
Exterior & Interior
3
Oct 1, 2015 03:20 PM



