Zaino Check List.. need HELP!!
#1
Zaino Check List.. need HELP!!
Hey guys,
Give me the shopping list for Zaino. When I pick up my Z hopefully this weekend what will I need to be getting from the Zaino store online to make this car shine like no other car out there !
Give me the shopping list for Zaino. When I pick up my Z hopefully this weekend what will I need to be getting from the Zaino store online to make this car shine like no other car out there !
#2
A guy that lives down the street use to be a distributor for Zaino, and now he started his own brand that is suppose to be better than Zaino. Let me know if you want is name so you can speak with him.
Cheaper too.
Cheaper too.
#3
if you go to the site they have a package, i think it's like $70-$80. That's what I bought and it came with everything, Z2, Z5, Z6, claybar, pads, etc.
www.zainostore.com
www.zainostore.com
#4
As Jun mentioned, the starter package is a good place to start. If you want to save a few bucks, you can also buy everything in the starter package separately minus the Z5, if your car is relatively new enough that it doesn't have any swirl marks or fine scratches yet.
#5
it wouldnt hurt to put 2 coats of Z5 on before you start using Z2 because there are most likely clear coat scratches even if you cant see them. Maybe its just cause i have superblack, but its my goal that by the end of this summer to have at least 20 coats of z5 to elimate those friggin swirl marks. Also look at the wheel shiner which isnt included in the starter package, and make sure you pick up good high quality microfibre towels. This will reduce swirl marks, and make buffing easier by using good towels.
#7
Originally posted by hornet59
If I was to claybar my Z, how long should I expect to take to do it? I bought all my zaino products including the claybar and I was just wondering about the work time involved with the claybar.
If I was to claybar my Z, how long should I expect to take to do it? I bought all my zaino products including the claybar and I was just wondering about the work time involved with the claybar.
Thread
Thread Starter
Forum
Replies
Last Post
Colombo
Forced Induction
35
11-09-2020 11:27 AM